Kitchen Remodel in Livermore, CA

 Busy Homeowners in Livermore —

Award-Winning Go2 Design Studio Turns Your Kitchen into a Model Master Chef Dream for Less than You Ever Imagined Possible!

… while making sure you
fas|fa-check|
Get the most for your money
fas|fa-check|
Discover your true Style DNA
fas|fa-check|
Eliminate costly change orders, and
fas|fa-check|
Complete the project in the fastest possible way

Our Work

Color, Line, Material, and Texture that
Perfectly-Match our Clients’
Unique Style-DNA and Personality

What’s your Style-DNA?

Hi, my name is Severine Secret

and I am the owner and lead designer of Go2 Design Studio.

Over the past 20 years we’ve been working on high-end residential projects in the Bay Area, and with leading companies like Google, LinkedIn, Adobe, and Apple.

Our goal is to make the homeowner ecstatic about their new look while avoiding the 4 pitfalls, as you shall see below.
Whether you already have a designer working with you or are looking for one – my team and I are here to hold your hand and guide you every step of the way.

 

To your success!

Severine
September, 2019

Call us with any design or remodeling question. We're here to help.

(866) 246-3636

Now before you hire a designer, pay a contractor, or purchase expensive finishing materials

Wouldn’t you like to see your newly-remodeled kitchen –

Without Spending a Single Dime?

Now you can!

Every month we cover the cost of a kitchen remodel simulation for 5 homeowners around Livermore ($500 value).

Send us a clear picture of your existing kitchen, and we will show you how your new kitchen could look in 3-D!

Here is an example

Picture of an existing kitchen

3-D simulation of the same kitchen – remodeled

Upload your picture,

give us some direction,

and let us show you how to

Transform your Vision into a Reality!

Picture Upload Form



Call us with any design or remodeling question. We're here to help.

(866) 246-3636

But every project also have
4 Pitfalls

et|arrow_carrot-right_alt2|=

Your hard-earned dollars are not going into the best areas

  • Is it better to spend more in the kitchen or in the bathrooms?
  • Should we add a pool in the backyard, or get large palm trees?
  • Is changing the floor plan to create another room but reducing the size of the other rooms a good idea?
et|arrow_carrot-right_alt2|=

The never-ending timeline

The construction industry is notorious of having delay upon delay.

Some are inevitable (like getting the plans approved with the city planning department).

But many delays are just due to bad planning or follow up with your contractor.

These delays often cost you more money that you expected, like paying mortage on your new home while also pyaing rent on a place for your family to stay during construction.

  • How can those timeline missteps be minimized?
  • How to hold your contractor accountable to the original time table?
et|arrow_carrot-right_alt2|=

Change orders and budget overruns

These projects are notorious to start at one price, but end up 30% or higher than the original estimate.

  • Why is that?
  • How change orders can be minimized, or even completely eliminated?
et|arrow_carrot-right_alt2|=

Mismatch between your expectations and the finished project

  • How come you don’t feel as comfortable in your new space as you thought you would when the project was designed?
  • Is there anything you could have done differently to get exactly what you wanted?

What these problems mean to you are
Unplanned Extra Costs  •  Wasted Time  •  Heartaches

The Solution?

20 Things to do BEFORE you start your project!

Download the Cheat Sheet that will show you

et|icon_check|N
What is the most important thing in your drawings
et|icon_check|N
What is the most important room in the house (and what is the second one)
et|icon_check|N
Between a designer and contractor, who should you approach first (and why)

Call us with any design or remodeling question. We're here to help.

(866) 246-3636

Common Questions about Kitchen Remodel in Livermore, CA

The length of time does it take to tile a kitchen?

According to specialists, it takes a beginner about 16 hours to lay ceramic or stone tiles in a typical space. An individual with intermediate abilities takes about 12 hours and specialists, such as our Lewisville experts at Pro Floor covering, take about 10.

The length of time does it take to remodel a kitchen around Livermore, California?

A typical kitchen takes between four to six weeks to remodel, not consisting of the preparation and style stage. Kitchen renovation depends upon the material quality and conditions throughout construction complete.

What does a new kitchen cost?

The average cost of kitchen remodeling for your average-sized kitchen will be over $20,000 The final cost will depend upon the size of your kitchen along with how elegant cabinets or devices you wish to install. A major kitchen renovation might cost you anywhere between $40,000 to $70,000. Confess.

Should I remodel my kitchen before selling around Livermore, CA?

Misconception No. 1: I need to redo my kitchen and bathroom before offering. Truth: While kitchens and bathrooms can increase the worth of a house, you won’t get a large return on investment if you do a major renovation just before offering. Minor renovations, on the other hand, may assist you sell your house for a higher price.

Do I need a designer for a kitchen remodel nearby Livermore?

The need for a designer depends upon the scope of your kitchen remodel and the designated result. Smaller sized projects, such as including a window or taking apart a non-bearing wall, generally do not need the need for an architect or designer.

Just how much is a luxury kitchen remodel?

A high-end kitchen costs more than $29,000, with an average of $45,000. A small, inexpensive kitchen will cost in between $72– $143 per square foot. A small, mid-range kitchen will cost in between $157– $400 per square foot. A little, luxury kitchen will cost $414+, with the average falling closer to $643 per square foot.

In what order do you remodel a kitchen in Livermore, CA?

How to Renovate Your Kitchen in the Right Sequence of PhasesMake a Wish List. First things first. Find out Your Budget. Employ a Contractor. Demolition Starts. Figure Out Place of Light Fixtures, Electric Outlets, and Home appliances. Set-Up and Install Mechanical Systems. Install Insulation, Drywall, and Flooring. Set Up Cabinets and Counters.

How do I start a kitchen remodel?

Follow these steps to start off your remodel on the ideal foot.Step 1– Prepare Yourself. Step 2– Assess Your Wants and Needs. Step 3– Set a Remodel Timeline. Step 4– Set Project Goals. Step 5– Go Shopping. Action 6– Determine a Remodel Budget. Step 7– Bring in the Pros.

About Kitchen Remodeling

A kitchen is a room or part of a room used for cooking and food preparation in a dwelling or in a commercial establishment. A modern middle-class residential kitchen is typically equipped with a stove, a sink with hot and cold running water, a refrigerator, and worktops and kitchen cabinets arranged according to a modular design. Many households have a microwave oven, a dishwasher, and other electric appliances. The main functions of a kitchen are to store, prepare and cook food (and to complete related tasks such as dishwashing). The room or area may also be used for dining (or small meals such as breakfast), entertaining and laundry. The design and construction of kitchens is a huge market all over the world.

Commercial kitchens are found in restaurants, cafeterias, hotels, hospitals, educational and workplace facilities, army barracks, and similar establishments. These kitchens are generally larger and equipped with bigger and more heavy-duty equipment than a residential kitchen. For example, a large restaurant may have a huge walk-in refrigerator and a large commercial dishwasher machine. In some instances commercial kitchen equipment such as commercial sinks are used in household settings as it offers ease of use for food preparation and high durability.

In developed countries, commercial kitchens are generally subject to public health laws. They are inspected periodically by public-health officials, and forced to close if they do not meet hygienic requirements mandated by law.[citation needed]

About Home Improvement

The concept of home improvement, home renovation, or remodeling is the process of renovating or making additions to one’s home. Home improvement can consist of projects that upgrade an existing home interior (such as electrical and plumbing), exterior (masonry, concrete, siding, roofing), or other improvements to the property (i.e. garden work or garage maintenance/additions).

About Livermore, California

Livermore (formerly Livermores, Livermore Ranch, and Nottingham) is a city in Alameda County, California, in the United States. With an estimated 2017 population of 89,648, Livermore is the most populous city in the Tri-Valley. Livermore is located on the eastern edge of California’s San Francisco Bay Area. The incumbent Mayor of Livermore is John Marchand.

Livermore was founded by William Mendenhall and named for Robert Livermore, his friend and a local rancher who settled in the area in the 1840s. Livermore is the home of the Lawrence Livermore National Laboratory, for which the chemical element livermorium is named (and thus, placing the city’s name in the periodic table). Livermore is also the California site of Sandia National Laboratories, which is headquartered in Albuquerque, New Mexico. Its south side is home to local vineyards. The city has redeveloped its downtown district and is considered part of the Tri-Valley area, comprising Amador, Livermore and San Ramon valleys.

Driving Directions

Livermore to Go2 Design Studio

Zip Codes

94550 94551 94588

Summary
Service Type
Kitchen Remodel
Provider Name
Go2 Design Studio,
20465 Los Gatos-Saratoga Rd, Saratoga ,California-95070,
Telephone No.(408) 617-8636
Area
Livermore, CA
Description
Kitchen Remodel in Livermore, CA

Get Your Free Report!

Please enter your details so that we know where to send the report.

You have Successfully Subscribed!