Kitchen Remodel in Los Altos, CA

 Busy Homeowners in Los Altos —

Award-Winning Go2 Design Studio Turns Your Kitchen into a Model Master Chef Dream for Less than You Ever Imagined Possible!

… while making sure you
fas|fa-check|
Get the most for your money
fas|fa-check|
Discover your true Style DNA
fas|fa-check|
Eliminate costly change orders, and
fas|fa-check|
Complete the project in the fastest possible way

Our Work

Color, Line, Material, and Texture that
Perfectly-Match our Clients’
Unique Style-DNA and Personality

What’s your Style-DNA?

Hi, my name is Severine Secret

and I am the owner and lead designer of Go2 Design Studio.

Over the past 20 years we’ve been working on high-end residential projects in the Bay Area, and with leading companies like Google, LinkedIn, Adobe, and Apple.

Our goal is to make the homeowner ecstatic about their new look while avoiding the 4 pitfalls, as you shall see below.
Whether you already have a designer working with you or are looking for one – my team and I are here to hold your hand and guide you every step of the way.

 

To your success!

Severine
November, 2019

Call us with any design or remodeling question. We're here to help.

(866) 246-3636

Now before you hire a designer, pay a contractor, or purchase expensive finishing materials

Wouldn’t you like to see your newly-remodeled kitchen –

Without Spending a Single Dime?

Now you can!

Every month we cover the cost of a kitchen remodel simulation for 5 homeowners around Los Altos ($500 value).

Send us a clear picture of your existing kitchen, and we will show you how your new kitchen could look in 3-D!

Here is an example

Picture of an existing kitchen

3-D simulation of the same kitchen – remodeled

Upload your picture,

give us some direction,

and let us show you how to

Transform your Vision into a Reality!

Picture Upload Form



Call us with any design or remodeling question. We're here to help.

(866) 246-3636

But every project also have
4 Pitfalls

et|arrow_carrot-right_alt2|=

Your hard-earned dollars are not going into the best areas

  • Is it better to spend more in the kitchen or in the bathrooms?
  • Should we add a pool in the backyard, or get large palm trees?
  • Is changing the floor plan to create another room but reducing the size of the other rooms a good idea?
et|arrow_carrot-right_alt2|=

The never-ending timeline

The construction industry is notorious of having delay upon delay.

Some are inevitable (like getting the plans approved with the city planning department).

But many delays are just due to bad planning or follow up with your contractor.

These delays often cost you more money that you expected, like paying mortage on your new home while also pyaing rent on a place for your family to stay during construction.

  • How can those timeline missteps be minimized?
  • How to hold your contractor accountable to the original time table?
et|arrow_carrot-right_alt2|=

Change orders and budget overruns

These projects are notorious to start at one price, but end up 30% or higher than the original estimate.

  • Why is that?
  • How change orders can be minimized, or even completely eliminated?
et|arrow_carrot-right_alt2|=

Mismatch between your expectations and the finished project

  • How come you don’t feel as comfortable in your new space as you thought you would when the project was designed?
  • Is there anything you could have done differently to get exactly what you wanted?

What these problems mean to you are
Unplanned Extra Costs  •  Wasted Time  •  Heartaches

The Solution?

20 Things to do BEFORE you start your project!

Download the Cheat Sheet that will show you

et|icon_check|N
What is the most important thing in your drawings
et|icon_check|N
What is the most important room in the house (and what is the second one)
et|icon_check|N
Between a designer and contractor, who should you approach first (and why)

Call us with any design or remodeling question. We're here to help.

(866) 246-3636

Common Questions about Kitchen Remodel in Los Altos, CA

In what order do you remodel a kitchen in Los Altos?

How to Renovate Your Kitchen in the Right Sequence of PhasesMake a Wish List. First things first. Find out Your Budget. Work with a Contractor. Demolition Starts. Figure Out Area of Light Fixtures, Electric Outlets, and Appliances. Set-Up and Set Up Mechanical Systems. Set Up Insulation, Drywall, and Flooring. Install Cabinets and Counters.

Should I paint or replace kitchen cabinets?

Cost out changing your kitchen cabinets and painting will look better and much better. The cost to paint a kitchen is usually 1/3 to 1/2 the cost of replacing. The paints applied to cabinets are also extremely resilient and will last simply as long as brand-new cabinets for the most part.

Is a kitchen remodel an excellent financial investment?

The basic guideline is that the less loan invested updating the kitchen before resale, the much better. Your objective is to attain a makeover without overspending or updating too much. Throughout every region in the report, a minor kitchen remodel uses the best roi of any kitchen remodel type.

Does a kitchen remodel include value?

For example, the national average ROI for a major upscale kitchen remodel is practically 54%. That indicates you recoup about $68,000 after investing around $126,000. What about a smaller renovation task? The typical cost of a small kitchen remodel has to do with $21,000, and the typical quantity recovered is $17,000.

How long should kitchen areas last?

A good quality kitchen ought to last well over 20 years.

What is the most costly part of a kitchen remodel?

The most expensive element of any kitchen remodel is normally the cabinets, which usually cost upwards of $15,000. In second place are brand-new devices, costing usually around $8,200. The counter tops are the next greatest expense, generally costing simply under $6,000.

When remodeling your kitchen do you do the floors initially near Los Altos, CA?

If you are installing a wood drifting floor (or any floating floor such as cork or laminate), you need to set up the flooring AFTER the kitchen cabinets are set up. Floating floors are clicked together and not adhered to the flooring.

Should I remodel my kitchen prior to offering around Los Altos, California?

Myth No. 1: I require to renovate my kitchen and restroom before selling. Truth: While bathroom and kitchens can increase the worth of a home, you won’t get a large roi if you do a major renovation just before offering. Small remodellings, on the other hand, may assist you sell your house for a greater price.

How long does it take to renovate a little kitchen?

Though naturally it depends upon the size and kind of kitchen remodel, I can securely state that an average kitchen takes in between 4 to 6 weeks to remodel, not including the preparation and style phase.

What does a new kitchen cost?

The average cost of kitchen remodeling for your average-sized kitchen will be over $20,000 The last cost will depend on the size of your kitchen as well as how elegant cabinets or appliances you want to install. A major kitchen renovation might cost you anywhere between $40,000 to $70,000. Admit it.

About Kitchen Remodeling

A kitchen is a room or part of a room used for cooking and food preparation in a dwelling or in a commercial establishment. A modern middle-class residential kitchen is typically equipped with a stove, a sink with hot and cold running water, a refrigerator, and worktops and kitchen cabinets arranged according to a modular design. Many households have a microwave oven, a dishwasher, and other electric appliances. The main functions of a kitchen are to store, prepare and cook food (and to complete related tasks such as dishwashing). The room or area may also be used for dining (or small meals such as breakfast), entertaining and laundry. The design and construction of kitchens is a huge market all over the world.

Commercial kitchens are found in restaurants, cafeterias, hotels, hospitals, educational and workplace facilities, army barracks, and similar establishments. These kitchens are generally larger and equipped with bigger and more heavy-duty equipment than a residential kitchen. For example, a large restaurant may have a huge walk-in refrigerator and a large commercial dishwasher machine. In some instances commercial kitchen equipment such as commercial sinks are used in household settings as it offers ease of use for food preparation and high durability.

In developed countries, commercial kitchens are generally subject to public health laws. They are inspected periodically by public-health officials, and forced to close if they do not meet hygienic requirements mandated by law.[citation needed]

About Home Improvement

The concept of home improvement, home renovation, or remodeling is the process of renovating or making additions to one’s home. Home improvement can consist of projects that upgrade an existing home interior (such as electrical and plumbing), exterior (masonry, concrete, siding, roofing), or other improvements to the property (i.e. garden work or garage maintenance/additions).

About Los Altos, California

Los Altos (/lɔːs ˈæltoʊs/ (listen)) is a city in Santa Clara County, California, in northern Silicon Valley, in the San Francisco Bay Area. The population was 28,976 according to the 2010 census.

Most of the city’s growth occurred between 1950 and 1980. Originally an agricultural town with many summer cottages and apricot orchards, Los Altos is now a town in Silicon Valley. Los Altos has commercial zones, strictly limited to the downtown area, as well as small shopping and office parks lining Foothill Expressway and El Camino Real.

The median household income of Los Altos for 2013–2017 was $208,309. The average home listing price in 2014 was $1.96 million. In 2017, Forbes ranked Los Altos (94022 and 94024) as the 3rd and 48th most expensive ZIP codes in the United States with median home prices of $7,755,000 and $3,431,615, respectively. In 2018, data from the American Community Survey revealed that Los Altos was the fifth wealthiest city in the United States.

Los Altos means “the heights” in Spanish.

Driving Directions

Los Altos to Go2 Design Studio

Zip Codes

94022 94023 94024

Summary
Service Type
Kitchen Remodel
Provider Name
Go2 Design Studio,
20465 Los Gatos-Saratoga Rd, Saratoga ,California-95070,
Telephone No.(408) 617-8636
Area
Los Altos, CA
Description
Kitchen Remodel in Los Altos, CA

Get Your Free Report!

Please enter your details so that we know where to send the report.

You have Successfully Subscribed!