Kitchen Remodel in Pleasure Point, CA

 Busy Homeowners in Pleasure Point —

Award-Winning Go2 Design Studio Turns Your Kitchen into a Model Master Chef Dream for Less than You Ever Imagined Possible!

… while making sure you
fas|fa-check|
Get the most for your money
fas|fa-check|
Discover your true Style DNA
fas|fa-check|
Eliminate costly change orders, and
fas|fa-check|
Complete the project in the fastest possible way

My name is Severine Secret

and I am the owner and lead designer of Go2 Design Studio.

Over the past 20 years we’ve been working on high-end residential projects in the Bay Area, and with leading companies like Google, LinkedIn, Adobe, and Apple.

Our goal is to make the homeowner ecstatic about their new look while avoiding the 4 pitfalls, as you shall see below.
Whether you already have a designer working with you or are looking for one – my team and I are here to hold your hand and guide you every step of the way.

 

To your success!

Severine
September, 2019

Call us with any design or remodeling question. We're here to help.

(866) 246-3636

Now before you hire a designer, pay a contractor, or purchase expensive finishing materials

Wouldn’t you like to see your newly-remodeled kitchen –

Without Spending a Single Dime?

Now you can!

Every month we cover the cost of a kitchen remodel simulation for 5 homeowners around Pleasure Point ($500 value).

Send us a clear picture of your existing kitchen, and we will show you how your new kitchen could look in 3-D!

Here is an example

Picture of an existing kitchen

3-D simulation of the same kitchen – remodeled

Upload your picture,

give us some direction,

and let us show you how to

Transform your Vision into a Reality!

Picture Upload Form



Call us with any design or remodeling question. We're here to help.

(866) 246-3636

But every project also have
4 Pitfalls

et|arrow_carrot-right_alt2|=

Your hard-earned dollars are not going into the best areas

  • Is it better to spend more in the kitchen or in the bathrooms?
  • Should we add a pool in the backyard, or get large palm trees?
  • Is changing the floor plan to create another room but reducing the size of the other rooms a good idea?
et|arrow_carrot-right_alt2|=

The never-ending timeline

The construction industry is notorious of having delay upon delay.

Some are inevitable (like getting the plans approved with the city planning department).

But many delays are just due to bad planning or follow up with your contractor.

These delays often cost you more money that you expected, like paying mortage on your new home while also pyaing rent on a place for your family to stay during construction.

  • How can those timeline missteps be minimized?
  • How to hold your contractor accountable to the original time table?
et|arrow_carrot-right_alt2|=

Change orders and budget overruns

These projects are notorious to start at one price, but end up 30% or higher than the original estimate.

  • Why is that?
  • How change orders can be minimized, or even completely eliminated?
et|arrow_carrot-right_alt2|=

Mismatch between your expectations and the finished project

  • How come you don’t feel as comfortable in your new space as you thought you would when the project was designed?
  • Is there anything you could have done differently to get exactly what you wanted?

What these problems mean to you are
Unplanned Extra Costs  •  Wasted Time  •  Heartaches

The Solution?

20 Things to do BEFORE you start your project!

Download the Cheat Sheet that will show you

et|icon_check|N
What is the most important thing in your drawings
et|icon_check|N
What is the most important room in the house (and what is the second one)
et|icon_check|N
Between a designer and contractor, who should you approach first (and why)

Call us with any design or remodeling question. We're here to help.

(866) 246-3636

Common Questions about Kitchen Remodel in Pleasure Point, CA

When remodeling your kitchen do you do the floorings first near Pleasure Point, CA?

If you are setting up a hardwood drifting floor (or any drifting floor such as cork or laminate), you ought to install the floor AFTER the kitchen cabinets are set up. Floating floorings are clicked together and not complied with the floor.

How frequently should I remodel my kitchen?

Typical Timeframe for Home Remodeling While there’s no real hard and fast guideline for home remodeling, there is an average timeframe that can be amassed from looking at home remodeling statistics. In basic, the average time between remodellings of a kitchen area is approximately ten to fifteen years.

The length of time should kitchen areas last?

An excellent quality kitchen must last well over 20 years.

Should I remodel my kitchen prior to offering around Pleasure Point, California?

Myth No. 1: I need to redo my kitchen and bathroom before selling. Reality: While bathroom and kitchens can increase the value of a home, you will not get a large return on investment if you do a major renovation right before selling. Minor remodellings, on the other hand, may assist you offer your home for a greater rate.

The length of time does it require to tile a kitchen?

According to specialists, it takes a newbie about 16 hours to lay ceramic or stone tiles in an average room. A person with intermediate skills takes about 12 hours and experts, such as our Lewisville experts at Pro Floor covering, take about 10.

What is the most pricey part of a kitchen remodel?

The most costly aspect of any kitchen remodel is normally the cabinets, which typically cost upwards of $15,000. In 2nd location are new home appliances, costing on average around $8,200. The counter tops are the next greatest expenditure, normally costing just under $6,000.

Should I paint or change kitchen cabinets?

Cost out changing your kitchen cabinets and painting will look much better and better. The cost to paint a kitchen is generally 1/3 to 1/2 the cost of changing. The paints applied to cabinets are likewise extremely resilient and will last simply as long as brand-new cabinets most of the times.

In what order do you remodel a kitchen in Pleasure Point, California?

How to Renovate Your Kitchen in the Right Sequence of PhasesMake a Wish List. First things first. Find out Your Budget. Work with a Contractor. Demolition Starts. Figure Out Place of Light Fixtures, Electric Outlets, and Appliances. Set-Up and Set Up Mechanical Systems. Install Insulation, Drywall, and Floor covering. Set Up Cabinets and Counters.

How do I begin a kitchen remodel?

Follow these steps to start your remodel on the ideal foot.Step 1– Prepare Yourself. Step 2– Assess Your Wants and Needs. Action 3– Set a Remodel Timeline. Step 4– Set Project Goals. Step 5– Go Shopping. Action 6– Determine a Remodel Budget. Step 7– Bring in the Pros.

About Kitchen Remodeling

A kitchen is a room or portion of a room used for cooking and food preparation in a address or in a billboard start. A forward looking middle-class residential kitchen is typically equipped in the same way as a stove, a sink bearing in mind warm and Cool meting out water, a refrigerator, and worktops and kitchen cabinets established according to a modular design. Many households have a microwave oven, a dishwasher, and additional electric appliances. The main functions of a kitchen are to increase, prepare and cook food (and to unquestionable related tasks such as dishwashing). The room or Place may along with be used for dining (or little meals such as breakfast), hilarious and laundry. The design and construction of kitchens is a big make public everything higher than the world.

want ad kitchens are found in restaurants, cafeterias, hotels, hospitals, bookish and workplace services, army barracks, and same establishments. These kitchens are generally larger and equipped following improved and more heavy-duty equipment than a residential kitchen. For example, a large restaurant may have a big walk-in refrigerator and a large billboard dishwasher robot. In some instances public notice kitchen equipment such as commercial sinks are used in household settings as it offers ease of use for food preparation and tall durability.

In developed countries, announcement kitchens are generally subject to public health laws. They are inspected periodically by public-health officials, and motivated to near if they complete not meet hygienic requirements mandated by law.[citation needed]

About Home Improvement

The concept of home proceed, home renovation, or remodeling is the process of renovating or making additions to one’s house. house press on can consist of projects that reorganize an existing house interior (such as electrical and plumbing), exterior (masonry, genuine, siding, roofing), or new improvements to the property (i.e. garden put it on or garage maintenance/additions).

About Pleasure Point, California

Pleasure point is a census-designated place (CDP) in Santa Cruz County, California. Pleasure dwindling sits at an height of 33 feet (10 m). The 2010 united States census reported Pleasure point’s population was 5,846.

Driving Directions

Pleasure Point to Go2 Design Studio

Zip Codes

95062

Summary
Service Type
Kitchen Remodel
Provider Name
Go2 Design Studio,
20465 Los Gatos-Saratoga Rd, Saratoga ,California-95070,
Telephone No.(408) 617-8636
Area
Pleasure Point, CA
Description
Kitchen Remodel in Pleasure Point, CA

Get Your Free Report!

Please enter your details so that we know where to send the report.

You have Successfully Subscribed!